Creator Portal for Audiovisual Rights
3 user groups, 1 portal

Avate ry represents audiovisual creators in Finland: screenwriters, directors, actors. They needed a digital Creator Portal where rights holders could manage work metadata, verify crediting, and connect to global ISNI identifiers. Credits get lost. Names get misspelled. Roles are incorrectly attributed.
Three user groups needed different things from the same portal. Creators needed to see and correct their credits. Production companies needed to register new works. Avate as administrator needed oversight. The ISNI integration added technical complexity: the National Library's API handles registrations but isn't a lookup service, and KAVI's databases have a five-year archiving window.
The shape of the week
- 01
Team kickoff with Ceon development team to scope the €55K phase one budget
- 02
Two user workshops: one with Avate organization, one with individual creators
- 03
Full Figma prototype covering every screen and user flow
- 04
Magic link authentication over passwords to reduce friction
- 05
Progressive ISNI handling: auto-search KAVI, fallback to National Library API
- 06
Modular design system with ShadCN components for future extensibility
The moment that surfaced
The intersection between organizational requirements and individual creator needs defined the MVP precisely. The workshops surfaced that crediting corrections were the core value. Not metadata management. Not ISNI lookups. Just: is my name on the right work with the right role?
What the week bought
Prototype approved and handed off to development. Phase one covers rights holder registration, ISNI linking, and crediting corrections. Architecture supports future phases: production company portals, expanded databases, and direct API integrations.
- Full Figma prototype approved by client and development team
- Three user groups served through one portal with role-based permissions
- Magic link authentication eliminating password management
- ISNI integration designed for progressive discovery and registration
Why the sprint earns its week
With a €55K budget and complex integrations, every unnecessary feature could have eaten the timeline. The workshops identified what mattered most. The prototype confirmed it. Development started building the right thing.
Want this kind of result? Start with the version that matches your situation
These pages break the work down by the problem teams usually feel first, before they know what kind of engagement they actually need.
Design & Validate
Customer Research Workshop
Bring the voice of the customer into the room before the roadmap hardens around internal assumptions.
Service Transformation
Internal Tools Consultant
Fix the workflows your team actually lives in every day, not just the customer-facing product everyone remembers to improve.
Service Transformation
Service Blueprinting Consultant
Map what really happens across teams, systems, and touchpoints, then redesign the parts that keep the service from working.